Step #10 Of The 13 Design-Build Process Steps With Maplewood Custom Homes


These steps were put together as a collaboration with #DesignBuildMagazine and #MaplewoodCustomHomes to bring you the last 4 steps of the 13 residential design-build process steps over the next three weeks for a greater understanding of #DesignBuildProcess for your next new home.

"FOLLOW ALONG ON OUR VIDEO CHANNEL"

Step #10 Pre-Construction and Foundation Pre-Construction and Foundation -

Pre-Construction and Foundation - Let the work begin!

  • Make Any final changes to the blueprints can be made but should be finalized in the final plans at this time.

  • City water and sewer, or if you're on an out lot or rural location the well and septic connections will be finished.

  • A rough grade will be completed and the foundation will be placed.

**Your family needs are important after finalizing the floor plans. FINALLY, LET THE WORK BEGIN! The foundation placement begins after the water and sewer connections are done.

We are a Proud Member of DBIN – Learn More From The Design Build International Network

**source ** https://www.designbuildmagazine.com/design-build-process

#NewHomeDesignBuild #MaplewoodCustomHomes #NewHomesRochesterMN #RochesterNeighborhoods #BuildToSuit

#DesignBuild #MaplewoodCustomHomes #RochesterMN

Tel: 507.251.8851
PO Box 6822 Rochester, MN 55903-6822
info@MaplewoodHomesRochester.com
DBIN-Logo-GOLD-BLUE2.png
badge_16_7_2x.png
Maplewood Custom Homes is featured in www.BuildRochester.mn

See Us In www.BuildRochester.mn

© 2019 Maplewood Custom Homes, LLC - License # BC296720 - web design by Design Build Media Group an R Thomas Consulting, LLC company - All photos are Maplewood Custom Homes