Step #10 Of The 13 Design-Build Process Steps With Maplewood Custom Homes

April 18, 2019

These steps were put together as a collaboration with #DesignBuildMagazine and #MaplewoodCustomHomes to bring you the last 4 steps of the 13 residential design-build process steps over the next three weeks for a greater understanding of #DesignBuildProcess for your next new home.

 

 "FOLLOW ALONG ON OUR VIDEO CHANNEL"

 

 

Step #10 Pre-Construction and Foundation Pre-Construction and Foundation -

 

 

Pre-Construction and Foundation - Let the work begin!

 

  • Make Any final changes to the blueprints can be made but should be finalized in the final plans at this time.

 

  • City water and sewer, or if you're on an out lot or rural location the well and septic connections will be finished.

 

  • A rough grade will be completed and the foundation will be placed.

 

 

 

**Your family needs are important after finalizing the floor plans. FINALLY, LET THE WORK BEGIN! The foundation placement begins after the water and sewer connections are done.

 

 

 

 

 

 

 

 

We are a Proud Member of DBIN – Learn More From The Design Build International Network

**source ** https://www.designbuildmagazine.com/design-build-process

 

#NewHomeDesignBuild #MaplewoodCustomHomes #NewHomesRochesterMN #RochesterNeighborhoods #BuildToSuit

 

 

 

 

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

Let 2020 be extraordinary in home design-build

January 24, 2020

1/10
Please reload

Recent Posts
Please reload

Archive